Current Projects:
Interested in what we're working
on at the moment? Below are our current projects.
Please be patient while the pictures load, this page is very graphic
intensive. Thank-you!
1955 Chris Craft
21' Capri - Full Restoration project.



The 331 Chrysler Hemi was removed and the boat was turned over
ready to remove the bottom.

The bottom is being removed.

One half of the bottom removed.

Inner layer of diaginal planking going on like original bottom
The inner layer is on. Instead of the original canvis we used
6 oz. cloth to seal the inner layer. Now the bottom planks are
being fitted

The outter planks are installed bedded in 3M 5200 caulk. The original
planks were used as patterns to make the but joints in the same
place.
The bottom planks were sealed with Smiths penatrating epoxy, the
under side of the planks were sealed with Smiths before being
bedded back on

All new hull planks are being installed
Boat being turned over to start on upper plank and deck

Deck being removed

New covering boards being made

All new deck framing

Stern
deck being done

All the deck frames, battens and blocking are done
1/4" saple plywood was put over the intire deck

Deck planks are being fitted

The old stern deck boards

New stern deck boards

All new deck boards are in place. Just need to make the stern
covering board. Then its time for every ones favorite thing, lots
of sanding.
|